Yichang HEC Pharmaceutical Co., Ltd. Environmental Information Disclosure in the Second Quarter of 2016
2016-07-15
According to the relevant requirements in the Measures for the Disclosure of Environmental Information of Enterprises and Institutions, our company voluntarily discloses the following information.
1. Basic information of the enterprise
1. Production situation
From April to June 2016, the company produced 1,164.5 tons of erythromycin, 23.72 tons of azithromycin and 31.5 tons of clarithromycin, with a total industrial output value of 450 million yuan this quarter.
2. Consumption
From April to June 2016, the company consumed 17,642 tons of corn starch, 4,611 tons of soybean flour, and 2,504 tons of soybean oil; took 9,012,535 tons of water, consumed 7,360 tons of coal, consumed 138,108,800 kwh of electricity, and consumed 298,577 tons of steam.
2. Pollutant discharge
1. Wastewater discharge
This quarter, the No. 2 and No. 3 sewage stations are operating normally, treating a total of 950,598 tons of sewage, discharging 92.04 tons of COD and 4.19 tons of ammonia nitrogen. Among them, No. 2 sewage station treats 117,936 tons of sewage, and No. 3 sewage station treats 832,662 tons of sewage.
2. Exhaust emissions
In this quarter, the boiler flue gas treatment facilities at No. 2 and No. 3 were operating normally, with a total of 136.1633 million m3 of flue gas treated, emitting SO212.29 tons, NOX 25.51 tons, and soot 6.16 tons.
3. Solid waste disposal
This quarter, 8236.46 tons of general solid waste were disposed of. Among them, 1,866 tons of slag were sold as building materials; 4,579.48 tons of dried sludge and 1,790.48 tons of dried mushroom slag were all transported to thermal power plants for incineration. Waste packaging bags, packaging barrels, etc. are recycled by manufacturers. This quarter, 70.72 tons of hazardous waste were disposed of, including 39.93 tons of organic solvent waste (HW06) and 30.79 tons of distillation residue (HW11), all of which were entrusted to a qualified company (the 61699 Hazardous Waste Disposal Center of the Chinese People's Liberation Army), and the company's hazardous waste storage venue is standardized, the ledger is clear, and the transfer form is complete.
3. Payment of sewage charges
According to the approval of Yidu Environmental Protection Bureau, the company should pay 157,447 yuan of sewage charges this quarter, and the actual payment of 157,447 yuan has been paid in full.
4. Project approval and construction
There was no approval or construction of new projects in this quarter.
V. Environmental Risk Management
According to the company's annual drill plan, in May, the company's third branch organized an "emergency drill for acetone leakage from tanks to be inspected"; in June, the company's production planning department carried out an "emergency drill for liquid alkali leakage". The Ministry of Environmental Protection is involved in the collection, treatment, and monitoring of accidental water, as well as air quality monitoring around the plant.
6. Environmental monitoring
The company entrusted Yichang Dingshun Testing Co., Ltd. to carry out environmental monitoring on the waste water and waste gas of No. 2 and No. 3 sites. According to the monitoring results, both waste water and waste gas of the company were discharged up to the standard. The relevant monitoring report is as follows.
Related news
WeChat public account
2022 Copyright by HEC Group 粤ICP备19034764号-1